~dwlewis/public_html/index

subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Don Winfield LewisUF Logo

Welcome to My Homepage!

Adjunct Lecturer, Construction Engineering Group
Office: 460D Weil Hall
Tel: (352) 392-9537 ext. 1487
Fax: (352) 392-1036
E-mail: dwlewis@ufl.edu
Mailing address: University of Florida Department of Civil & Coastal Engineering
                         P.O. Box 116580
                         365 Weil Hall
                         Gainesville, FL 32611

Lubricants Area Manager and Qualifying Agent, Lewis Oil Company/Petroleum Aids
Office: 621 South East Depot Avenue
Tel: (352) 376-3293
Fax: (352) 377-6673
E-mail: don.w.lewis@cox.net
Mailing address: P.O. Box 1282
                        Gainesville, FL 32602-1282

May 14, 1966

Originally born in Live Oak, Florida, Don Winfield Lewis has been a resident of Gainesville, Florida, since 1968, when his late father, Hugh Wendell Lewis, relocated the family while working for Standard Oil of Kentucky. Eventually, a small distributorship of oils and light products would become Lewis Oil Company, a multifaceted conglomerate of Industrial, wholesale, and retail interests. After seventeen years of helping build the local business, Don Winfield Lewis went back to school to earn a Doctorate of Philosophy degree in Civil Engineering and started teaching part time at the University of Florida.

As a person who was always fascinated by science and technology, civil engineering came naturally to Don. Particularly interested in mechanics and physics, Don approached his education with great pride and devotion. Starting in high school, Don began working at the Transportation Research Center at the University of Florida, writing computer programs and teaching. He was fortunate to be able to work with the latest in video image recognition technology for use in recognizing dilemma zones at intersections. After graduation, the opportunity to work with the petroleum industry intrigued him, so he dedicated himself to realizing his father's dream by consolidating local distributorships into one centrally located distribution and processing center.

Articles Submitted for Publication

Using Contractor Bid Amounts to Estimate the Impact of Night Construction on Productivity for Highway and Bridge Construction. Journal of Construction and Engineering Management. more.

Computerized Planning and Scheduling In 1917, Henry Gantt developed a method for effectively relating a list of activities to a time scale by drawing a bar chart that later became known as a Gantt chart. Activities are represented as bars on the chart, which are measured according to a timeline located across the top or bottom of the chart. Each bar is drawn from the starting time of the activity until its ending time. The Gantt chart has been widely used in depicting schedules for construction projects and has some very useful characteristics. Its primary advantage is that its simple graphic representation allows one to grasp schedule information quickly and easily. more.

Articles PublishedDilemma Zone Response at Signalized Intersections. Masters Report.

Techniques for Improving Producitvity on a Troubled Bridge Project. Journal of Construction and Engineering Management. more.

Temporary Structures One property inherent to concrete is that it can be formed into any shape. The wet mixture is placed in a form constructed of wood, metal, or another suitable material to harden or set. The form must be assembled with quality workmanship with close attention to dimensional tolerances. Formwork should be strong enough to support the weight of the concrete and rigid enough to maintain its position and appearance. In addition, formwork must be tight enough to prevent water seepage and designed to permit ready removal. Because the formwork for a concrete structure constitutes a considerable item in the cost of the completed structure, particular care should be exercised in its design. more.

Construction Methods and Management The objective for this course is to build and develop knowledge and skills in the fundamentals of construction methods and equipment utilization. Additionally, students will acquire basic knowledge of the legal aspects of engineering and construction contracting. Students will further develop knowledge and skills in the legal aspects of professional practice (ABET). more.

Professionalism and Ethics On the night of January 27, 1986, Roger Boisjoly, engineer with Morton Thiokol, faced a crisis. The Space Center was counting down to a shuttle launch the next morning. In a teleconference with the Space Center, however, his superior, Robert Lund, had conveyed the engineers' recommendation against launching. This recommendation was based on concerns about the ability of the O-rings to seal at low temperatures. more.

chomping gatorAbout Us | Site Map | Privacy Policy | Contact Me | ©2012 Lewis