THE BRIDGE II
"DESIGN FOR ASSEMBLY"
STUDENT
WHY DOES THIS PROBLEM MATTER?
This is a challenging project that deals with one of the
problems associated with any product sold in the world --
assembly. One of the specifications a design engineer must
consider is how much a product will cost when it reaches the
salesroom floor. Often, a very large portion of the cost is due
to the assembly time. If a product is designed with the factory
worker in mind and can be assembled at a rapid rate, the company
can retail its product at a substantial discount.
What we have done with this project is to introduce one more
important trade-off that most engineers must take into account
when designing products. Our list then grows to three:
- to carry the most weight possible
- to be as light as possible
- to be assembled in the least amount of time possible.
Today, companies often use one armed robots to assemble their
products. This may make it even more important that there are
easy ways to manipulate and attach the components of the product.

Figure 1.
WHAT ARE WE SUPPOSED TO DO?
Prior to the formal testing, you may design your bridge,
manufacture your pieces, and test them to see how well they fit
together. Your bridge will be evaluated in 2 phases, the
assembly phase and the testing phase.
The assembly phase will begin with your bridge pieces separated
on the top of a table. No two pieces of your bridge may be
touching at this point. When the instructor is ready to time
your group, your assembly procedure may begin. To make this
interesting process (as well as to mimic several one armed
robots), each member of your group may only use one hand to put
the bridge together. Note, besides having a well designed
bridge, it is imperative for your team to practice the assembly
process and work together as a team -- as though you are a group
of one armed robots being manipulated by one computer. Each time
a team member fails to keep one hand behind his/her back. A
minute is added to the assembly time. The instructor will stop
timing when the team members have placed the bridge on the
abutments and are ready for the next phase.
The testing phase may takes place once the bridge is assembled,
and must meet the following requirements: Your bridge must touch
only the tops of 2 wood platforms that are 6"x6" and spaced 2'
apart (see figure 1). Your bridge must rest on the platforms
during the entire testing process. You may not nail, screw,
drill, or otherwise modify or attach to the platforms.
In order for you instructor to test your bridge, you must attach
the eye hook provided to the bottom, center of your bridge. Only
the hook can extend below the 2 foot level (top of the
abutments).
WHAT EQUIPMENT AND MATERIALS CAN WE USE?
Your bridge may consist of the following:
- 5 blocks of styrofoam (.75 x 10 x 5) inches
- 5 rubber bands
- 10 paper clips
- 1 piece of wood (3.75 x 3.75 x 3.75) inches
- 10 nails
- 16 inches of clear tape, max width 1 inch
- all the spaghetti you want
- 2-2 liter soda bottles (empty or full of original contents or
water)
- 1 foot wooden dowel rod, diameter _ 1/2 inch
- 4 feet of string
- 1 hook
You may use any tools at your disposal (typically - hammer,
pliers, etc.)
HOW WILL WE KNOW HOW WELL WE HAVE SUCCEEDED?
After you construct your bridge, in the assembly phase, the
instructor will stop timing and attach a basket to the eye hook
and add weights gently in small increments until the basket
touches the ground, (whether your bridge fractures or deflects
when the basket hits the ground the test is over).
The Basic Performance Requirement for the bridge is that you
build a structure that is able to hold the basket.
The Superior Performance Index (SPI) will be calculated by
dividing the weight you support by the weight of your bridge
minus the time it takes your team to assemble your bridge.
SPI = [weight supported (grams) / weight of your bridge (grams)]
- assemble time (minutes)
WHAT ELSE MIGHT BE USEFUL TO KNOW?
You will need all the information given in the Bridge I handout
as well as the information you learned during that project.
Recall which designs worked well and how they could be improved.
Keep in mind which designs were easy to assemble. Remember, if
two hands are required for a specific operation, it will require
two people to do it, and it will probably be two dominate hands
(i.e. two right hands for two right-handed people).
SAFETY CONSIDERATIONS UNIQUE TO THIS PROJECT
It is important that no part of your body is under the weights
while your bridge is being tested. Also remember to exercise
caution when using any tool while you are constructing your
bridge.